How to read this tracker
Projects are grouped by the latest step their records quote: a council vote, a commission recommendation, a filed proposal, a design stage or a county decision. A proposal is not an approval, an approval is not a building permit, and a permit is not a construction start, so check which step a record actually describes before you plan around it.
Sizes are written the way the source writes them, in quotation marks where possible. Where two reports disagree, as they do on the unit count at 3150 El Camino Real, both figures appear with the publisher and date of each. Dates attached to future events, such as an expected review or a construction fiscal year, are the source's projections.
Projects: council votes reported in 2026
Projects where a dated news report quotes a City Council vote. A vote of support or approval is not a building permit or a construction start.
3781 El Camino Real
Location as the source states it: 3781 El Camino Real. Type: Apartment project replacing existing units and a commercial plaza. Size as stated: "the 183-apartment project"; "It would replace 14 existing units and a commercial plaza".
Status (as of May 12, 2026): Unanimous vote of approval reported.
- May 12, 2026: Palo Alto Online reports the project "was greeted at the dais with lavish praise and a unanimous vote of approval." [4]
Record: Palo Alto Online, Council approves 183-apartment complex in Ventura [4]
156 California Ave
Location as the source states it: 156 California Ave.. Type: Mixed-use tower project with housing. Size as stated: "390 homes, including 50 below-market-rate units"; described as a "14-story project".
Status (as of May 19, 2026): Council voted 4-2 in favor.
- May 19, 2026: "The council voted 4-2 in favor of the 14-story project, with Reckdahl and Burt opposing it." [1]
- September 1, 2026: "The project would include 390 homes, including 50 below-market-rate units." [2]
Record: Palo Alto Online, Divided council signals support for 14-story tower project [1]; Palo Alto Online, How Palo Alto's newest housing projects are testing the limits of what can be built [2]
Projects: commission recommendation reported
A commission recommendation goes to the City Council, which makes the decision.
Stanford, former Red Cross building
Location as the source states it: Former Red Cross building, Palo Alto (address not stated in the quoted passage). Type: Conditional use permit for reuse of an existing building.
Status (as of July 31, 2025): Commissioners voted to recommend Council approval of the conditional use permit.
- July 31, 2025: "all five commissioners present at the meeting voted to recommend that the City Council approve the conditional use permit application." [7]
Record: Palo Alto Online, Stanford clears major hurdle in plan to repurpose former Red Cross building [7]
Projects: applications and proposals filed in 2026
Proposals reported between July and October 2026. A filed application is a document on the record, not a decision, and several of these were described as early-stage.
2675 El Camino Real (Chipotle building)
Location as the source states it: 2675 El Camino Real. Type: Housing complex replacing a restaurant building. Size as stated: "an 85-foot-tall complex featuring 156 apartments". Applicant named in the record: Bayspring Development Partners.
Status (as of October 12, 2026): Proposal reported.
- October 12, 2026: "The firm Bayspring Development Partners is looking to replace the restaurant at 2675 El Camino Real"; the building "would be demolished and replaced with an 85-foot-tall complex featuring 156 apartments." [3]
Record: Palo Alto Online, Chipotle building could make way for housing project near Cal Ave [3]
Town & Country Village housing proposal
Location as the source states it: Surface parking lots at Town & Country Village. Type: Apartments on shopping-center parking lots. Size as stated: "158 apartment units in two seven-story buildings".
Status (as of September 1, 2026): Proposal described.
- September 1, 2026: "The proposal calls for 158 apartment units in two seven-story buildings on the surface parking lots." [2]
Record: Palo Alto Online, How Palo Alto's newest housing projects are testing the limits of what can be built [2]
135 University Ave
Location as the source states it: 135 University Ave.. Type: Downtown housing development. Size as stated: "a seven-story development".
Status (as of September 1, 2026): Application reported; one of nine housing applications filed in a two-week July window.
- July 10, 2026: The applicant is "looking to build a seven-story development at 135 University Ave." [5]
- September 1, 2026: "The proposal is one of nine Palo Alto housing applications submitted during a two-week window in July." [2]
Record: Palo Alto Online, Downtown housing proposal becomes the sixth to lean on new state law [5]; Palo Alto Online, How Palo Alto's newest housing projects are testing the limits of what can be built [2]
College Avenue mixed-use proposal
Location as the source states it: College Avenue (the street number is not in the quoted passage; see the record). Type: Mixed-use: housing with ground-floor commercial space. Size as stated: "a six-story development with 70 residential units and commercial space on the ground floor".
Status (as of July 8, 2026): Proposal reported.
- July 8, 2026: A proposal to "construct a six-story development with 70 residential units and commercial space on the ground floor." [6]
Record: Palo Alto Online, Palo Alto sees wave of housing projects as state law kicks in [6]
127-129 Lytton Ave
Location as the source states it: 127-129 Lytton Ave.. Type: Mixed-use: housing with ground-floor commercial space. Size as stated: "a 75-foot-tall development ... featuring 24 residential units and commercial space on the ground floor".
Status (as of July 8, 2026): Proposal reported.
- July 8, 2026: "a 75-foot-tall development at 127-129 Lytton Ave. featuring 24 residential units and commercial space on the ground floor." [6]
Record: Palo Alto Online, Palo Alto sees wave of housing projects as state law kicks in [6]
Hamilton Avenue apartments and office proposal
Location as the source states it: Hamilton Avenue, downtown (the street number is not in the quoted passage; see the record). Type: Mixed-use: apartments and office space. Size as stated: "a six-story complex with 21 apartments, office space and five ground-floor parking spaces".
Status (as of July 8, 2026): Proposal reported.
- July 8, 2026: "a six-story complex with 21 apartments, office space and five ground-floor parking spaces." [6]
Record: Palo Alto Online, Palo Alto sees wave of housing projects as state law kicks in [6]
Coronet Motel site
Location as the source states it: 2455 El Camino Real. Type: Housing complex replacing a motel. Size as stated: Not stated in the quoted passage.
Status (as of July 8, 2026): Proposal reported.
- July 8, 2026: The report lists "proposals to replace Coronet Motel at 2455 El Camino Real with a housing complex." [6]
Record: Palo Alto Online, Palo Alto sees wave of housing projects as state law kicks in [6]
Projects: in design, Council review expected
A housing project where the record gives an expected review window, which is a projection.
Lot T affordable housing
Location as the source states it: Lot T, as the project is identified in the report (address not stated in the quoted passage). Type: Affordable housing. Size as stated: Not stated in the quoted passage.
Status (as of September 1, 2026): "City Council review expected by the end of 2026".
- September 1, 2026: "City Council review expected by the end of 2026." [2]
Record: Palo Alto Online, How Palo Alto's newest housing projects are testing the limits of what can be built [2]
Projects: reported in 2026, unit count differs between reports
A project whose two most recent reports give different unit counts. Both are shown; this page does not choose one.
3150 El Camino Real (former Fish Market site)
Location as the source states it: 3150 El Camino Real, the former site of The Fish Market. Type: Housing. Size as stated: 386 homes (Palo Alto Online, September 1, 2026) or 368 apartments (Palo Alto Online, October 12, 2026).
Status (as of October 12, 2026): Described in both reports; the quoted passages do not name an approval or construction step.
- September 1, 2026: "this development will bring 386 new homes to Palo Alto." [2]
- October 12, 2026: "the 368-apartment complex at the former site of The Fish Market at 3150 El Camino Real." [3]
Where the sources differ:
- Palo Alto Online, September 1, 2026: 386 new homes.
- Palo Alto Online, October 12, 2026: a 368-apartment complex.
Record: Palo Alto Online, How Palo Alto's newest housing projects are testing the limits of what can be built [2]; Palo Alto Online, Chipotle building could make way for housing project near Cal Ave [3]
Projects: decided by Santa Clara County, not the City
Stanford's campus lands are governed by a county general use permit. Santa Clara County, not the Palo Alto City Council, makes that decision.
Stanford general use permit (campus growth plan)
Location as the source states it: Stanford University campus. Type: County general use permit for campus growth. Applicant named in the record: Stanford University.
Deciding agency: Santa Clara County (approving body).
Status (as of November 6, 2025): Application planned; no application quoted as filed.
- November 6, 2025: "Stanford hopes to submit an application in 2026 and get approval from Santa Clara County in early 2028." Both dates are Stanford's hopes as reported, not a schedule. [8]
Record: Palo Alto Online, Stanford embarks on new plan for campus growth [8]
Infrastructure in the works in Palo Alto
Public works below come from the City of Palo Alto's adopted FY 2026 capital budget, its proposed FY 2027 budget letter and dated Palo Alto Online reports. Each entry names the lead agency and gives cost and funding only where a record states them. Figures from the adopted FY 2026 budget and the proposed FY 2027 budget are kept apart and never added together.
A budget line or a design approval is not a construction start. Where a record gives a construction year or an expected completion, it is repeated as the source's projection.
New Downtown Parking Garage
Location as the source states it: "existing Parking Lot D at the corner of Hamilton Avenue and Waverley Street" (FY 2026 adopted capital budget). Type: Public parking garage. Size as stated: "two entrances, an elevator and 266 spaces" under the plans approved June 4.
Lead agency: City of Palo Alto. Cost and funding as stated: "projected to cost about $34.7 million," with "about half of the funding coming from the University Avenue Parking In Lieu Fund" (Palo Alto Online); the FY 2026 adopted capital budget lists "$10.1 million from the University Avenue Parking In Lieu Fund".
Status (as of June 29, 2026): Design approved by the board June 4, 2026; construction planned in fiscal year 2028.
- Undated budget document: FY 2026 adopted capital budget: the "concept option was approved in April 2025 and design is anticipated to be completed in Fall 2026." [10]
- April 24, 2026: The proposed FY 2027 budget would "transition the New Downtown Parking Garage from design to the procurement and construction phase." [11]
- June 29, 2026: "Under plans that the board approved on June 4, it would include two entrances, an elevator and 266 spaces," and "construction will take place in fiscal year 2028, which begins on July 1, 2027." [9]
Record: City of Palo Alto, FY 2026 adopted capital budget [10]; City of Palo Alto, FY 2027 proposed budget transmittal letter [11]; Palo Alto Online, After legal dispute, downtown garage advances with board's blessing [9]
Newell Road Bridge replacement
Location as the source states it: Newell Road bridge over San Francisquito Creek. Type: Bridge replacement.
Lead agency: City of Palo Alto ("Spearheaded by the city of Palo Alto"). Cost and funding as stated: "the $16- million project"; the article says one funder "provided $10 million for the bridge replacement"; a "$2.6-million deal with Zoon Engineering for construction management services" was reported in June 2025.
Status (as of May 21, 2026): Closed to cars so replacement work can begin.
- June 17, 2025: Palo Alto Online reports contracts approved, including "a $2.6-million deal with Zoon Engineering for construction management services." [13]
- May 21, 2026: "the bridge over San Francisquito Creek was officially closed down to cars on Thursday so that work can begin to replace it." [12]
Record: Palo Alto Online, Palo Alto approves contracts to replace Newell Road bridge [13]; Palo Alto Online, Newell bridge earns fond sendoff as replacement work begins [12]
Rail grade separation at Charleston Road and Meadow Drive
Location as the source states it: "the existing at- grade crossings on Meadow Drive and Charleston Road in the Caltrain Rail Corridor" (FY 2026 adopted capital budget). Type: Rail grade separation.
Lead agency: City of Palo Alto (capital budget project), in the Caltrain Rail Corridor. Cost and funding as stated: FY 2026 adopted capital budget: "$80.7 million, is for three of the four rail grade separation locations"; Palo Alto Online, September 2026: the options "would collectively cost more than $1.5 billion, according to new projections"; the proposed FY 2027 budget notes funding "partially funded by Measure K Business Tax".
Status (as of September 9, 2026): Council support for a Charleston underpass and a Meadow hybrid design (December 2025); focus narrowing to Charleston Road (September 2026).
- December 16, 2025: "Palo Alto leaders have put their support behind an underpass at Charleston Road and a hybrid design at Meadow Drive"; environmental review "is expected to be complete by October 2027 to comply with funding deadlines." [14]
- April 24, 2026: The proposed FY 2027 budget mentions "Recognizing investments in grade separation projects (partially funded by Measure K Business Tax." [11]
- September 9, 2026: City leaders are "preparing to narrow their scope and focus their energy on one location: Charleston Road." [15]
Record: City of Palo Alto, FY 2026 adopted capital budget [10]; Palo Alto Online, Palo Alto council advances hybrid grade separation at Meadow, underpass at Charleston [14]; City of Palo Alto, FY 2027 proposed budget transmittal letter [11]; Palo Alto Online, As costs rise, Palo Alto scales back rail redesign plans [15]
California Avenue, Ramona Street and University Avenue streetscapes
Location as the source states it: California Avenue, Ramona Street and University Avenue. Type: Streetscape redesign.
Lead agency: City of Palo Alto. Cost and funding as stated: No cost stated in the quoted passages.
Status (as of January 5, 2026): University Avenue assessment district on hold; a completion date extended to 2026.
- January 5, 2026: "creating an assessment district to fund University Avenue streetscape improvements, remains on hold"; the same article reports that "completion was extended to 2026." [16]
Record: Palo Alto Online, Palo Alto lags on lofty goals to redesign Cal Ave, Ramona Street [16]
Fiber to the Premises and dark fiber rebuild
Location as the source states it: Citywide (City of Palo Alto Utilities fiber system). Type: Municipal fiber utility.
Lead agency: City of Palo Alto. Cost and funding as stated: No cost stated in the quoted passages.
Status (as of April 24, 2026): Phase 1 pilot planning in the proposed FY 2027 budget.
- December 2022: FY 2026 adopted capital budget: "In December 2022, Council approved the fiber expansion plan to rebuild the dark fiber backbone." [10]
- April 24, 2026: "Planning for the Phase 1 pilot of Fiber to the Premises/Dark Fiber rebuild." [11]
Record: City of Palo Alto, FY 2026 adopted capital budget [10]; City of Palo Alto, FY 2027 proposed budget transmittal letter [11]
Electric Grid Modernization
Location as the source states it: Citywide (City of Palo Alto electric utility). Type: Electric utility capital projects.
Lead agency: City of Palo Alto. Cost and funding as stated: "Generational investment of $57.0 million in Electric Grid Modernization projects" (proposed FY 2027 budget).
Status (as of April 24, 2026): Included in the proposed FY 2027 budget.
- April 24, 2026: "Generational investment of $57.0 million in Electric Grid Modernization projects." [11]
Record: City of Palo Alto, FY 2027 proposed budget transmittal letter [11]
City plans: Comprehensive Plan, Housing Element, area plans and capital program
These are the adopted and proposed plans in our record. A plan is not a project. If you own or lease near one of these areas, read the plan text rather than a summary.
Comprehensive Plan (Our Palo Alto)
Kind: General plan. Area as stated: Citywide. Adoption: Update adopted November 2017.
- Undated City document: "The Comprehensive Plan update adopted in November 2017 brings all the Plan Elements up to date," covering "land use, circulation, conservation, housing, open space, noise, and safety." [17]
- Undated City document: An amendment to "reduce the citywide maximum allowable new office and R&D development from 1.7 million square feet to 850,000 square feet." [17]
- Undated City document: An amendment "to increase housing sites along San Antonio Road between Middlefield Road and East Charleston Road." [17]
- Undated City document: A City Manager report describes "a 50,000 square foot annual limit on new office space that applies to downtown, California Avenue Area and El Camino Real." [18]
Record: City of Palo Alto, Comprehensive Plan page [17]; City of Palo Alto, City Manager report on office development limits [18]
Housing Element 2023-2031
Kind: Housing element. Area as stated: Citywide. Adoption: "April 15, 2024 Adopted August 20, 2024 Certified" (document cover).
- Undated City document: Document cover: "April 15, 2024 Adopted August 20, 2024 Certified." [19]
- August 20, 2024: "The State notified the City of Palo Alto today, that the City's 2023-2031 Housing Element is certified." [20]
- August 20, 2024: The State found it in "substantial compliance with the State Housing Element Law"; the plan "aims to add 6,086 housing units by 2031." [21]
Record: City of Palo Alto, Housing Element 2023-2031 [19]; City of Palo Alto, Palo Alto's 2023-2031 Housing Element Certified [20]; Mountain View Voice, Palo Alto wins state blessing for housing plan [21]
North Ventura Coordinated Area Plan
Kind: Area plan. Area as stated: "the 60-acre North Ventura area". Adoption: Adopted by the City Council, reported August 6, 2024.
- August 6, 2024: "the Palo Alto City Council concluded on Monday its seven-year planning journey and adopted a new vision" for "the 60-acre North Ventura area." [22]
Record: Palo Alto Online, Eager for growth, Palo Alto adopts new vision for Ventura [22]
San Antonio Road Area Plan
Kind: Area plan (proposed). Area as stated: "the 275.3-acre area". Adoption: Not adopted as of the cited report.
- April 6, 2026: "The proposed San Antonio Road Area Plan divides the 275.3-acre area into subareas based on development potential," as "a roadmap for building more than 1,500 housing units." [23]
Record: Palo Alto Online, With new plan, council prepares to go big on housing around San Antonio [23]
El Camino Real Housing Focus Area
Kind: Zoning designation. Area as stated: "along the southern portion of the corridor".
- September 1, 2026: "a zoning designation along the southern portion of the corridor that allows taller and denser housing development." [2]
- October 12, 2026: "The recently created El Camino Real Focus Area sets a height limit of 85 feet for housing projects." [3]
Record: Palo Alto Online, How Palo Alto's newest housing projects are testing the limits of what can be built [2]; Palo Alto Online, Chipotle building could make way for housing project near Cal Ave [3]
Capital Improvement Program
Kind: Five-year capital improvement program. Area as stated: Citywide.
- July 1, 2025: Adopted FY 2026: "a FY 2026 Capital Budget of $312.9 million, and a Capital Plan of $1.1" (the quoted excerpt ends at that figure; read the letter for the unit). [28]
- April 24, 2026: Proposed FY 2027: "FY 2027 Capital Budget of $313.6 million, and a Capital Plan of $1.2 billion over the five-year CIP." These are proposed figures and are not combined with the adopted FY 2026 figures. [11]
- June 29, 2026: A news report refers to "the capital budget that the City Council approved earlier this month." The adopted FY 2027 totals were not verified for this page. [9]
Record: City of Palo Alto, FY 2026 adopted budget transmittal letter [28]; City of Palo Alto, FY 2027 proposed budget transmittal letter [11]; Palo Alto Online, After legal dispute, downtown garage advances with board's blessing [9]
City of Palo Alto building department: Development Services and the Development Center
The City's permit desk is Development Services, which describes itself as "a resource for homeowners, businesses, designers and contractors" and says it is located at 285 Hamilton Avenue. The City says the Development Center is open for virtual and in-person appointments and limited walk-in service, and that it no longer accepts paper plan submittals: all submittals must be in digital format.[24]
Within Development Services, the City says the Palo Alto Building Division "conducts plan review, issues building permits, provides inspection services, and oversees the Green Building program."[24] This site is not part of the City and does not file permits. Confirm hours, appointments and requirements on the City's own pages before you visit or submit.
Palo Alto building permit application: what needs a permit and how to apply
The City's building permit page says that projects including "tenant improvements, mechanical work, electrical work, plumbing work, etc. require a building permit." Among its commercial and mixed-use submittal checklists it lists a Tenant Improvement (TI) Checklist, and it says all payments must be made only through the City's official permitting portal, Accela Citizen Access.[25] The Development Services Forms page lists the building permit application form and a fee schedule.[27]
If you are a tenant planning improvements, ask the landlord in writing who will apply for the permit, who pays for plan review and inspections, and whether rent starts before the work is approved and finished. Ask how the lease handles a permit that takes longer than planned.
Palo Alto building permit search by address: Permit View lookup and records
The City's Palo Alto Permit View lets anyone "search building, planning, and code enforcement activity by property address, date, or application type." The City adds that it supports searching by assessor's parcel number, defining a custom geographic area for searches, and subscribing to email notifications based on a custom-drawn area.[26]
Before you sign a lease or make an offer, search the address and its neighbors. Note any open permits, planning applications or code enforcement records, and ask the owner or a California-licensed broker what each one means for your space and your schedule.
What to ask about a project near your property
If you lease or own near one of these sites, ask which body makes the next decision and when: the Architectural Review Board, the Planning and Transportation Commission, the City Council, or, for Stanford's campus permit, Santa Clara County.
If you are negotiating a lease next to a proposed tower or a construction site, ask the landlord how access, parking and signage would be handled during construction, and get the answer in the lease. For the rail work, compare your address against the Charleston Road and Meadow Drive crossings. Check any figure in a news report against the City document it came from, and take transaction questions to a California-licensed broker.
If a project on this page sits next to a building you own, note the address and the project you are watching. The leasing page builds that note on your device, for you to take to a California-licensed broker you choose.
Prepare a note about your buildingQuestions people ask
What development projects are planned in Palo Alto right now?
The records on this page cover housing and mixed-use proposals at 156 California Ave., 3781, 3150, 2675 and 2455 El Camino Real, 135 University Ave., 127-129 Lytton Ave., College Avenue, Hamilton Avenue, Town & Country Village and Lot T, plus a new downtown garage, the Newell Road bridge replacement and rail grade separation. Each entry carries its own dated status and record.
How many apartments are planned at 3150 El Camino Real?
The sources differ. Palo Alto Online on September 1, 2026 said the development "will bring 386 new homes to Palo Alto." Palo Alto Online on October 12, 2026 described "the 368-apartment complex at the former site of The Fish Market at 3150 El Camino Real." This page shows both and does not choose one; confirm the count with the City's project record.
Who approves Stanford's campus growth plan?
Santa Clara County, not the City of Palo Alto, decides Stanford's general use permit. Palo Alto Online reported on November 6, 2025 that "Stanford hopes to submit an application in 2026 and get approval from Santa Clara County in early 2028." Those dates are Stanford's hopes as reported, not a county schedule.
When will the new downtown Palo Alto parking garage be built?
Palo Alto Online reported on June 29, 2026 that "construction will take place in fiscal year 2028, which begins on July 1, 2027," after the board approved plans on June 4 with two entrances, an elevator and 266 spaces. The garage is planned on Parking Lot D at Hamilton Avenue and Waverley Street. The construction year is a projection.
Can I apply for a Palo Alto building permit online through the City's portal?
Yes. The City says it no longer accepts paper plan submittals and that all submittals must be in digital format. It names Accela Citizen Access as its official permitting portal and says all payments must be made only through it. Read the submittal checklist for your project type on the City's building permit page before you upload plans.
Which building permit forms, checklists and fees apply in Palo Alto?
The City's building permit page lists commercial and mixed-use submittal checklists, including a Tenant Improvement (TI) Checklist. Its Development Services Forms page lists the building permit application form and a fee schedule. This site does not publish fee amounts. Ask Development Services for the fees on your specific project before you budget the work.
Is there a Palo Alto building permit map?
The City's Palo Alto Permit View lets you search building, planning and code enforcement activity by address, date or application type. The City says it also supports defining a custom geographic area for searches and subscribing to email notifications based on a custom-drawn area, which lets you look at permit activity in an area you draw around a property.
What does the Palo Alto Building Division do?
The City says the Palo Alto Building Division conducts plan review, issues building permits, provides inspection services and oversees the Green Building program. It sits within Development Services, which the City says is located at 285 Hamilton Avenue and offers virtual and in-person appointments and limited walk-in service. Confirm current hours with the City before visiting.
Sources
- Divided council signals support for 14-story tower project, Palo Alto Online, May 19, 2026. Accessed October 13, 2026.
- How Palo Alto's newest housing projects are testing the limits of what can be built, Palo Alto Online, September 1, 2026. Accessed October 13, 2026.
- Chipotle building could make way for housing project near Cal Ave, Palo Alto Online, October 12, 2026. Accessed October 13, 2026.
- Council approves 183-apartment complex in Ventura, Palo Alto Online, May 12, 2026. Accessed October 13, 2026.
- Downtown housing proposal becomes the sixth to lean on new state law, Palo Alto Online, July 10, 2026. Accessed October 13, 2026.
- Palo Alto sees wave of housing projects as state law kicks in, Palo Alto Online, July 8, 2026. Accessed October 13, 2026.
- Stanford clears major hurdle in plan to repurpose former Red Cross building, Palo Alto Online, July 31, 2025. Accessed October 13, 2026.
- Stanford embarks on new plan for campus growth, Palo Alto Online, November 6, 2025. Accessed October 13, 2026.
- After legal dispute, downtown garage advances with board's blessing, Palo Alto Online, June 29, 2026. Accessed October 13, 2026.
- FY 2026 adopted capital budget, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- FY 2027 proposed budget transmittal letter, City of Palo Alto, April 24, 2026. Accessed October 13, 2026.
- Newell bridge earns fond sendoff as replacement work begins, Palo Alto Online, May 21, 2026. Accessed October 13, 2026.
- Palo Alto approves contracts to replace Newell Road bridge, Palo Alto Online, June 17, 2025. Accessed October 13, 2026.
- Palo Alto council advances hybrid grade separation at Meadow, underpass at Charleston, Palo Alto Online, December 16, 2025. Accessed October 13, 2026.
- As costs rise, Palo Alto scales back rail redesign plans, Palo Alto Online, September 9, 2026. Accessed October 13, 2026.
- Palo Alto lags on lofty goals to redesign Cal Ave, Ramona Street, Palo Alto Online, January 5, 2026. Accessed October 13, 2026.
- Comprehensive Plan page, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- City Manager report on office development limits, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- Housing Element 2023-2031, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- Palo Alto's 2023-2031 Housing Element Certified, City of Palo Alto, August 20, 2024. Accessed October 13, 2026.
- Palo Alto wins state blessing for housing plan, Mountain View Voice, August 20, 2024. Accessed October 13, 2026.
- Eager for growth, Palo Alto adopts new vision for Ventura, Palo Alto Online, August 6, 2024. Accessed October 13, 2026.
- With new plan, council prepares to go big on housing around San Antonio, Palo Alto Online, April 6, 2026. Accessed October 13, 2026.
- Development Services, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- Apply for a Building Permit, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- Palo Alto Permit View, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- Development Services Forms, City of Palo Alto, no publication date on the document; checked October 13, 2026. Accessed October 13, 2026.
- FY 2026 adopted budget transmittal letter, City of Palo Alto, July 1, 2025. Accessed October 13, 2026.